When we bought out house it only had 1.5 bathrooms and with 4 women in the house i knew that wouldn't work. So I decided it's time to make it a full bathroom. I started by cutting back the closet in the living and the dead space in my bouns room so I could have the extra room I needed. Once that was done walls were framed, Plummed and durock installed and ready for tile. At the point I added all new mold/mildew resistant drywall to make it perfect. After the shower was tiled we also decided to tile the half walls and install new tile on the floor. All new toilet, vanity and fixtures were added. Because of my busy work schedule it's taken me over a year to complete but now we can finally enjoy it.
When we bought out house it only had 1.5 bathrooms and with 4 women in the house i knew that wouldn't work. So I decided it's time to make it a full bathroom. I started by cutting back the closet in the living and the dead space in my bouns room so I could have the extra room I needed. Once that was done walls were framed, Plummed and durock installed and ready for tile. At the point I added all new mold/mildew resistant drywall to make it perfect. After the shower was tiled we also decided to tile the half walls and install new tile on the floor. All new toilet, vanity and fixtures were added. Because of my busy work schedule it's taken me over a year to complete but now we can finally enjoy it.